← back

!! NOT FOR OPERATIONAL USE !! data may be stale, incomplete, or wrong


numberJ3375/26 NEW
locationLTCF
begin2026-08-18 09:00 UTC (1d ago)
end2026-08-31 20:30 UTC (in 12d)
CADS id4442828
CADS seq11906777
CADS msgNMS_ID_1787044402991000

raw text:

RWY 06L/24R CENTERLINE:

58 METER FROM NORTH OF RWY CL: 
COORDINATES: 403344.67N0430629.79E 403344.77N0430630.08E 
403344.50N0430630.24E 403344.40N0430629.95E 
DUE TO CONCRETE MANUFACTURING WORKS EXCAVATION WORKS WILL BE CARRIED 
OUT WI THE ABOVE MENTIONED AREA.
EXCAVATION DIMENSIONS: 1-10 METER WIDTH, 0.70 METER DEPTH.

56 METER FROM NORTH OF RWY CL: 
COORDINATES:
403344.37N0430629.07E 403344.47N0430629.36E 403344.20N0430629.52E 
403344.10N0430629.23E
DUE TO CONCRETE MANUFACTURING WORKS EXCAVATION WORKS WILL BE CARRIED 
OUT WI THE ABOVE MENTIONED AREA.
EXCAVATION DIMENSIONS: 1-10 METER WIDTH, 0.70 METER DEPTH

33 METER FROM NORTH OF RWY CL: 
COORDINATES: 403336.65N0430610.16E 403336.75N0430610.45E 
403336.48N0430610.62E 403336.38N0430610.33E
DUE TO CONCRETE MANUFACTURING WORKS EXCAVATION WORKS WILL BE CARRIED 
OUT WITHIN THE ABOVE MENTIONED AREAS.
EXCAVATION DIMENSIONS: 1-10 METER WIDTH, 0.70 METER DEPTH

NOTE: ADVICE ATC INSTRUCTIONS.

icao text:

J3375/26 NOTAMN
 Q) LTAA/QMRHW/IV/BO /A /000/999/4034N04307E005
 A) LTCF B) 2608180900 C) 2608312030
 E) RWY 06L/24R CENTERLINE:
 
 58 METER FROM NORTH OF RWY CL: 
 COORDINATES: 403344.67N0430629.79E 403344.77N0430630.08E 
 403344.50N0430630.24E 403344.40N0430629.95E 
 DUE TO CONCRETE MANUFACTURING WORKS EXCAVATION WORKS WILL BE CARRIED 
 OUT WI THE ABOVE MENTIONED AREA.
 EXCAVATION DIMENSIONS: 1-10 METER WIDTH, 0.70 METER DEPTH.
 
 56 METER FROM NORTH OF RWY CL: 
 COORDINATES:
 403344.37N0430629.07E 403344.47N0430629.36E 403344.20N0430629.52E 
 403344.10N0430629.23E
 DUE TO CONCRETE MANUFACTURING WORKS EXCAVATION WORKS WILL BE CARRIED 
 OUT WI THE ABOVE MENTIONED AREA.
 EXCAVATION DIMENSIONS: 1-10 METER WIDTH, 0.70 METER DEPTH
 
 33 METER FROM NORTH OF RWY CL: 
 COORDINATES: 403336.65N0430610.16E 403336.75N0430610.45E 
 403336.48N0430610.62E 403336.38N0430610.33E
 DUE TO CONCRETE MANUFACTURING WORKS EXCAVATION WORKS WILL BE CARRIED 
 OUT WITHIN THE ABOVE MENTIONED AREAS.
 EXCAVATION DIMENSIONS: 1-10 METER WIDTH, 0.70 METER DEPTH
 
 NOTE: ADVICE ATC INSTRUCTIONS.

downloads:


!! NOT FOR OPERATIONAL USE !! data may be stale, incomplete, or wrong

© 2026 coredoes.dev