{"geometry":{"coordinates":[43.11666666666667,40.56666666666667],"type":"Point"},"id":4442828,"properties":{"icao_location":"LTCF","icao_text":"J3375/26 NOTAMN\r Q) LTAA/QMRHW/IV/BO /A /000/999/4034N04307E005\r A) LTCF B) 2608180900 C) 2608312030\r E) RWY 06L/24R CENTERLINE:\r \r 58 METER FROM NORTH OF RWY CL: \r COORDINATES: 403344.67N0430629.79E 403344.77N0430630.08E \r 403344.50N0430630.24E 403344.40N0430629.95E \r DUE TO CONCRETE MANUFACTURING WORKS EXCAVATION WORKS WILL BE CARRIED \r OUT WI THE ABOVE MENTIONED AREA.\r EXCAVATION DIMENSIONS: 1-10 METER WIDTH, 0.70 METER DEPTH.\r \r 56 METER FROM NORTH OF RWY CL: \r COORDINATES:\r 403344.37N0430629.07E 403344.47N0430629.36E 403344.20N0430629.52E \r 403344.10N0430629.23E\r DUE TO CONCRETE MANUFACTURING WORKS EXCAVATION WORKS WILL BE CARRIED \r OUT WI THE ABOVE MENTIONED AREA.\r EXCAVATION DIMENSIONS: 1-10 METER WIDTH, 0.70 METER DEPTH\r \r 33 METER FROM NORTH OF RWY CL: \r COORDINATES: 403336.65N0430610.16E 403336.75N0430610.45E \r 403336.48N0430610.62E 403336.38N0430610.33E\r DUE TO CONCRETE MANUFACTURING WORKS EXCAVATION WORKS WILL BE CARRIED \r OUT WITHIN THE ABOVE MENTIONED AREAS.\r EXCAVATION DIMENSIONS: 1-10 METER WIDTH, 0.70 METER DEPTH\r \r NOTE: ADVICE ATC INSTRUCTIONS.","id":4442828,"notam_number":"J3375/26","radius_nm":5.0,"raw_text":"RWY 06L/24R CENTERLINE:\r\n\r\n58 METER FROM NORTH OF RWY CL: \r\nCOORDINATES: 403344.67N0430629.79E 403344.77N0430630.08E \r\n403344.50N0430630.24E 403344.40N0430629.95E \r\nDUE TO CONCRETE MANUFACTURING WORKS EXCAVATION WORKS WILL BE CARRIED \r\nOUT WI THE ABOVE MENTIONED AREA.\r\nEXCAVATION DIMENSIONS: 1-10 METER WIDTH, 0.70 METER DEPTH.\r\n\r\n56 METER FROM NORTH OF RWY CL: \r\nCOORDINATES:\r\n403344.37N0430629.07E 403344.47N0430629.36E 403344.20N0430629.52E \r\n403344.10N0430629.23E\r\nDUE TO CONCRETE MANUFACTURING WORKS EXCAVATION WORKS WILL BE CARRIED \r\nOUT WI THE ABOVE MENTIONED AREA.\r\nEXCAVATION DIMENSIONS: 1-10 METER WIDTH, 0.70 METER DEPTH\r\n\r\n33 METER FROM NORTH OF RWY CL: \r\nCOORDINATES: 403336.65N0430610.16E 403336.75N0430610.45E \r\n403336.48N0430610.62E 403336.38N0430610.33E\r\nDUE TO CONCRETE MANUFACTURING WORKS EXCAVATION WORKS WILL BE CARRIED \r\nOUT WITHIN THE ABOVE MENTIONED AREAS.\r\nEXCAVATION DIMENSIONS: 1-10 METER WIDTH, 0.70 METER DEPTH\r\n\r\nNOTE: ADVICE ATC INSTRUCTIONS.","status":"NEW"},"type":"Feature"}