← back

!! NOT FOR OPERATIONAL USE !! data may be stale, incomplete, or wrong


numberF3193/26 CANCELLED
locationZSPD
begin2026-08-06 07:37 UTC (32d ago)
end2026-12-31 15:59 UTC (in 114d)
CADS id4194514
CADS seq11658622
CADS msgNMS_ID_1786004891252000

raw text:

IMPLEMENT THE LID(LANDING INFORMATION DELIVER) OPERATION 
TRIAL.THE BASIC LID PROCEDURE AS FOLLOW: 
1.SHANGHAI APPROACH WILL ISSUE THE LID MESSAGE BY DATA-LINK TO 
ARRIVAL FLIGHTS TO ZSPD 50 MINUTES BEFORE LANDING; 
2.THE LID INFORMATION WILL INCLUDE EXPECTED ARRIVAL PROCEDURE, 
TRANSITION(ON REQUIRED), LANDING RUNWAY, AND PARKING STAND; 
3.PILOT CAN DIRECTLY USE THE LID INFORMATION FOR FMS PREPARATION 
DURING CRUISE PHASE WITHOUT RADIO CONFIRMATION BY ACC.PRKG STAND 
INFORMATION FOR REFERENCE ONLY,BASED ON AD ALLOCATION,DO NOT 
CONTACT ATC FOR PRKG STAND INFORMATION IN AIR. 
4.ON INITIAL CONTACT SHANGHAI APPROACH,PILOT SHOULD ADVISE YOUR 
LID INFORMATION INCLUDING EXPECTED ARRIVAL PROCEDURE,TRANSITION(IF 
ANY), AND LANDING RUNWAY; 
5.SHANGHAI APPROACH WILL CONFIRM OR MODIFY FROM PILOT LID REPORT: 
6.AFTER ESTABLISH RADIO COMMUNICATION WITH SHANGHAI APPROACH, ALL 
CHANGE FOR THE LANDING INFORMATION SHOULD BE JUST FOLLOWED THE 
INSTRUCTION BY CONTROLLER . 
7.IF PILOT 
 ) 
// // DO NOT RECEIVE THE LID INFORMATION, PILOT SHOULD FOLLOW THE 
CURRENT PROCEDURE; 
8.FOR BETTER IMPROVE THE LID SERVICE, PLEASE FEEL FREE TO TELL US 
YOUR SUGGESTION AND COMMENTS TO EMAIL: 
SUNY1(A)ATMB.NET.CN 
 ) 
// //

icao text:

(F3193/26 NOTAMR F2392/26  Q)ZSHA/QXXXX/IV/NBO/AE/000/999/3109N12148E005  A)ZSPD B)2608060737 C)2612311559 EST  E) IMPLEMENT THE LID(LANDING INFORMATION DELIVER) OPERATION  TRIAL.THE BASIC LID PROCEDURE AS FOLLOW:  1.SHANGHAI APPROACH WILL ISSUE THE LID MESSAGE BY DATA-LINK TO  ARRIVAL FLIGHTS TO ZSPD 50 MINUTES BEFORE LANDING;  2.THE LID INFORMATION WILL INCLUDE EXPECTED ARRIVAL PROCEDURE,  TRANSITION(ON REQUIRED), LANDING RUNWAY, AND PARKING STAND;  3.PILOT CAN DIRECTLY USE THE LID INFORMATION FOR FMS PREPARATION  DURING CRUISE PHASE WITHOUT RADIO CONFIRMATION BY ACC.PRKG STAND  INFORMATION FOR REFERENCE ONLY,BASED ON AD ALLOCATION,DO NOT  CONTACT ATC FOR PRKG STAND INFORMATION IN AIR.  4.ON INITIAL CONTACT SHANGHAI APPROACH,PILOT SHOULD ADVISE YOUR  LID INFORMATION INCLUDING EXPECTED ARRIVAL PROCEDURE,TRANSITION(IF  ANY), AND LANDING RUNWAY;  5.SHANGHAI APPROACH WILL CONFIRM OR MODIFY FROM PILOT LID REPORT:  6.AFTER ESTABLISH RADIO COMMUNICATION WITH SHANGHAI APPROACH, ALL  CHANGE FOR THE LANDING INFORMATION SHOULD BE JUST FOLLOWED THE  INSTRUCTION BY CONTROLLER .  7.IF PILOT   )  // // DO NOT RECEIVE THE LID INFORMATION, PILOT SHOULD FOLLOW THE  CURRENT PROCEDURE;  8.FOR BETTER IMPROVE THE LID SERVICE, PLEASE FEEL FREE TO TELL US  YOUR SUGGESTION AND COMMENTS TO EMAIL:  SUNY1(A)ATMB.NET.CN   )  // //

downloads:


!! NOT FOR OPERATIONAL USE !! data may be stale, incomplete, or wrong

© 2026 coredoes.dev