!! NOT FOR OPERATIONAL USE !! data may be stale, incomplete, or wrong
| number | F3193/26 CANCELLED |
| location | ZSPD |
| begin | 2026-08-06 07:37 UTC (32d ago) |
| end | 2026-12-31 15:59 UTC (in 114d) |
| CADS id | 4194514 |
| CADS seq | 11658622 |
| CADS msg | NMS_ID_1786004891252000 |
raw text:
IMPLEMENT THE LID(LANDING INFORMATION DELIVER) OPERATION TRIAL.THE BASIC LID PROCEDURE AS FOLLOW: 1.SHANGHAI APPROACH WILL ISSUE THE LID MESSAGE BY DATA-LINK TO ARRIVAL FLIGHTS TO ZSPD 50 MINUTES BEFORE LANDING; 2.THE LID INFORMATION WILL INCLUDE EXPECTED ARRIVAL PROCEDURE, TRANSITION(ON REQUIRED), LANDING RUNWAY, AND PARKING STAND; 3.PILOT CAN DIRECTLY USE THE LID INFORMATION FOR FMS PREPARATION DURING CRUISE PHASE WITHOUT RADIO CONFIRMATION BY ACC.PRKG STAND INFORMATION FOR REFERENCE ONLY,BASED ON AD ALLOCATION,DO NOT CONTACT ATC FOR PRKG STAND INFORMATION IN AIR. 4.ON INITIAL CONTACT SHANGHAI APPROACH,PILOT SHOULD ADVISE YOUR LID INFORMATION INCLUDING EXPECTED ARRIVAL PROCEDURE,TRANSITION(IF ANY), AND LANDING RUNWAY; 5.SHANGHAI APPROACH WILL CONFIRM OR MODIFY FROM PILOT LID REPORT: 6.AFTER ESTABLISH RADIO COMMUNICATION WITH SHANGHAI APPROACH, ALL CHANGE FOR THE LANDING INFORMATION SHOULD BE JUST FOLLOWED THE INSTRUCTION BY CONTROLLER . 7.IF PILOT ) // // DO NOT RECEIVE THE LID INFORMATION, PILOT SHOULD FOLLOW THE CURRENT PROCEDURE; 8.FOR BETTER IMPROVE THE LID SERVICE, PLEASE FEEL FREE TO TELL US YOUR SUGGESTION AND COMMENTS TO EMAIL: SUNY1(A)ATMB.NET.CN ) // //
icao text:
(F3193/26 NOTAMR F2392/26 Q)ZSHA/QXXXX/IV/NBO/AE/000/999/3109N12148E005 A)ZSPD B)2608060737 C)2612311559 EST E) IMPLEMENT THE LID(LANDING INFORMATION DELIVER) OPERATION TRIAL.THE BASIC LID PROCEDURE AS FOLLOW: 1.SHANGHAI APPROACH WILL ISSUE THE LID MESSAGE BY DATA-LINK TO ARRIVAL FLIGHTS TO ZSPD 50 MINUTES BEFORE LANDING; 2.THE LID INFORMATION WILL INCLUDE EXPECTED ARRIVAL PROCEDURE, TRANSITION(ON REQUIRED), LANDING RUNWAY, AND PARKING STAND; 3.PILOT CAN DIRECTLY USE THE LID INFORMATION FOR FMS PREPARATION DURING CRUISE PHASE WITHOUT RADIO CONFIRMATION BY ACC.PRKG STAND INFORMATION FOR REFERENCE ONLY,BASED ON AD ALLOCATION,DO NOT CONTACT ATC FOR PRKG STAND INFORMATION IN AIR. 4.ON INITIAL CONTACT SHANGHAI APPROACH,PILOT SHOULD ADVISE YOUR LID INFORMATION INCLUDING EXPECTED ARRIVAL PROCEDURE,TRANSITION(IF ANY), AND LANDING RUNWAY; 5.SHANGHAI APPROACH WILL CONFIRM OR MODIFY FROM PILOT LID REPORT: 6.AFTER ESTABLISH RADIO COMMUNICATION WITH SHANGHAI APPROACH, ALL CHANGE FOR THE LANDING INFORMATION SHOULD BE JUST FOLLOWED THE INSTRUCTION BY CONTROLLER . 7.IF PILOT ) // // DO NOT RECEIVE THE LID INFORMATION, PILOT SHOULD FOLLOW THE CURRENT PROCEDURE; 8.FOR BETTER IMPROVE THE LID SERVICE, PLEASE FEEL FREE TO TELL US YOUR SUGGESTION AND COMMENTS TO EMAIL: SUNY1(A)ATMB.NET.CN ) // //
downloads:
!! NOT FOR OPERATIONAL USE !! data may be stale, incomplete, or wrong
© 2026 coredoes.dev