{"geometry":{"coordinates":[121.8,31.15],"type":"Point"},"id":4194514,"properties":{"icao_location":"ZSPD","icao_text":"(F3193/26 NOTAMR F2392/26  Q)ZSHA/QXXXX/IV/NBO/AE/000/999/3109N12148E005  A)ZSPD B)2608060737 C)2612311559 EST  E) IMPLEMENT THE LID(LANDING INFORMATION DELIVER) OPERATION  TRIAL.THE BASIC LID PROCEDURE AS FOLLOW:  1.SHANGHAI APPROACH WILL ISSUE THE LID MESSAGE BY DATA-LINK TO  ARRIVAL FLIGHTS TO ZSPD 50 MINUTES BEFORE LANDING;  2.THE LID INFORMATION WILL INCLUDE EXPECTED ARRIVAL PROCEDURE,  TRANSITION(ON REQUIRED), LANDING RUNWAY, AND PARKING STAND;  3.PILOT CAN DIRECTLY USE THE LID INFORMATION FOR FMS PREPARATION  DURING CRUISE PHASE WITHOUT RADIO CONFIRMATION BY ACC.PRKG STAND  INFORMATION FOR REFERENCE ONLY,BASED ON AD ALLOCATION,DO NOT  CONTACT ATC FOR PRKG STAND INFORMATION IN AIR.  4.ON INITIAL CONTACT SHANGHAI APPROACH,PILOT SHOULD ADVISE YOUR  LID INFORMATION INCLUDING EXPECTED ARRIVAL PROCEDURE,TRANSITION(IF  ANY), AND LANDING RUNWAY;  5.SHANGHAI APPROACH WILL CONFIRM OR MODIFY FROM PILOT LID REPORT:  6.AFTER ESTABLISH RADIO COMMUNICATION WITH SHANGHAI APPROACH, ALL  CHANGE FOR THE LANDING INFORMATION SHOULD BE JUST FOLLOWED THE  INSTRUCTION BY CONTROLLER .  7.IF PILOT   )  // // DO NOT RECEIVE THE LID INFORMATION, PILOT SHOULD FOLLOW THE  CURRENT PROCEDURE;  8.FOR BETTER IMPROVE THE LID SERVICE, PLEASE FEEL FREE TO TELL US  YOUR SUGGESTION AND COMMENTS TO EMAIL:  SUNY1(A)ATMB.NET.CN   )  // //","id":4194514,"notam_number":"F3193/26","radius_nm":5.0,"raw_text":"IMPLEMENT THE LID(LANDING INFORMATION DELIVER) OPERATION \nTRIAL.THE BASIC LID PROCEDURE AS FOLLOW: \n1.SHANGHAI APPROACH WILL ISSUE THE LID MESSAGE BY DATA-LINK TO \nARRIVAL FLIGHTS TO ZSPD 50 MINUTES BEFORE LANDING; \n2.THE LID INFORMATION WILL INCLUDE EXPECTED ARRIVAL PROCEDURE, \nTRANSITION(ON REQUIRED), LANDING RUNWAY, AND PARKING STAND; \n3.PILOT CAN DIRECTLY USE THE LID INFORMATION FOR FMS PREPARATION \nDURING CRUISE PHASE WITHOUT RADIO CONFIRMATION BY ACC.PRKG STAND \nINFORMATION FOR REFERENCE ONLY,BASED ON AD ALLOCATION,DO NOT \nCONTACT ATC FOR PRKG STAND INFORMATION IN AIR. \n4.ON INITIAL CONTACT SHANGHAI APPROACH,PILOT SHOULD ADVISE YOUR \nLID INFORMATION INCLUDING EXPECTED ARRIVAL PROCEDURE,TRANSITION(IF \nANY), AND LANDING RUNWAY; \n5.SHANGHAI APPROACH WILL CONFIRM OR MODIFY FROM PILOT LID REPORT: \n6.AFTER ESTABLISH RADIO COMMUNICATION WITH SHANGHAI APPROACH, ALL \nCHANGE FOR THE LANDING INFORMATION SHOULD BE JUST FOLLOWED THE \nINSTRUCTION BY CONTROLLER . \n7.IF PILOT \n ) \n// // DO NOT RECEIVE THE LID INFORMATION, PILOT SHOULD FOLLOW THE \nCURRENT PROCEDURE; \n8.FOR BETTER IMPROVE THE LID SERVICE, PLEASE FEEL FREE TO TELL US \nYOUR SUGGESTION AND COMMENTS TO EMAIL: \nSUNY1(A)ATMB.NET.CN \n ) \n// //","status":"CANCELLED"},"type":"Feature"}