!! NOT FOR OPERATIONAL USE !! data may be stale, incomplete, or wrong
| number | B1133/26 CANCELLED |
| location | LICC |
| begin | 2026-02-20 21:29 UTC (115d ago) |
| end | 2026-05-20 03:00 UTC (27d ago) |
| CADS id | 7088 |
| CADS seq | - |
| CADS msg | NMS_ID_1771623079721084 |
raw text:
A-CDM (AIRPORT COLLABORATIVE DECISION MAKING) PROCEDURE IMPLEMENTATION - PHASE 1 (LOCAL TRIAL) IN FORCE AT LICC - CATANIA/FONTANAROSSA AIRPORT. IN ACCORDANCE WITH AIC A 06/25, THE USE OF TSAT (TARGET START-UP APPROVAL TIME) FOR PRE-DEPARTURE SEQUENCING IS ACTIVATED. AUTOMATIC TRANSMISSION OF TTOT TO NMOC IS NOT ENABLED IN THIS PHASE. AIRCRAFT SHALL RECEIVE START-UP CLEARANCE IN ACCORDANCE WITH TSAT, EXCEPT WHEN CTOT (CALCULATED TAKE-OFF TIME) IS APPLICABLE. IN CASE OF CTOT-TSAT DISCREPANCIES, START-UP WILL BE ISSUED IN COMPLIANCE WITH CTOT ONCE 'READY' IS DECLARED. AIRLINE OPERATORS (AO) AND GROUND HANDLERS (GH) MUST KEEP EOBT/TOBT CONSTANTLY UPDATED AND MANAGE RELEVANT WARNINGS ON THE A-CDM PLATFORM. FURTHER DETAILS IN AIC A 06/25. RMK: PHASE 2 (LIVE DPI TRANSMISSION TO ETFMS-ENHANCED TACTICAL FLOW MANAGEMENT SYSTEM ) WILL BE PROMULGATED BY SEPARATE NOTAM. REF AIP AD 2 LICC 1-23
icao text:
B1133/26 NOTAMR B6764/25 Q) LIRR/QFAXX/IV/NBO/A /000/999/3728N01504E005 A) LICC B) 2602202129 C) 2605200300 EST E) A-CDM (AIRPORT COLLABORATIVE DECISION MAKING) PROCEDURE IMPLEMENTATION - PHASE 1 (LOCAL TRIAL) IN FORCE AT LICC - CATANIA/FONTANAROSSA AIRPORT. IN ACCORDANCE WITH AIC A 06/25, THE USE OF TSAT (TARGET START-UP APPROVAL TIME) FOR PRE-DEPARTURE SEQUENCING IS ACTIVATED. AUTOMATIC TRANSMISSION OF TTOT TO NMOC IS NOT ENABLED IN THIS PHASE. AIRCRAFT SHALL RECEIVE START-UP CLEARANCE IN ACCORDANCE WITH TSAT, EXCEPT WHEN CTOT (CALCULATED TAKE-OFF TIME) IS APPLICABLE. IN CASE OF CTOT-TSAT DISCREPANCIES, START-UP WILL BE ISSUED IN COMPLIANCE WITH CTOT ONCE 'READY' IS DECLARED. AIRLINE OPERATORS (AO) AND GROUND HANDLERS (GH) MUST KEEP EOBT/TOBT CONSTANTLY UPDATED AND MANAGE RELEVANT WARNINGS ON THE A-CDM PLATFORM. FURTHER DETAILS IN AIC A 06/25. RMK: PHASE 2 (LIVE DPI TRANSMISSION TO ETFMS-ENHANCED TACTICAL FLOW MANAGEMENT SYSTEM ) WILL BE PROMULGATED BY SEPARATE NOTAM. REF AIP AD 2 LICC 1-23
downloads:
!! NOT FOR OPERATIONAL USE !! data may be stale, incomplete, or wrong
© 2026 coredoes.dev