{"geometry":{"coordinates":[1.3666666666666667,43.63333333333333],"type":"Point"},"id":5271043,"properties":{"icao_location":"LFBO","icao_text":"A6457/26 NOTAMN\r Q) LFBB/QPICH/I /NBO/A /000/999/4338N00122E005\r A) LFBO B) 2610050500 C) 2610091330\r D) 05-08 0500-1530, 09 0500-1330\r E) OPR MNM CHANGED:\r - ILS Z 32L, ILS Y 32L AND LPV 32L:\r         ILS Z, ILS Y, LPV\r CAT     DA(H)          RVR      OCH\r A       760(270)       1300       261\r B       770(280)       1300       273\r C       780(290)       1400       281\r D       790(300)       1400       292\r DL     790(300)       1400       292\r - REF : AD2 LFBO IAC RWY32L FNA ILS Z LOC Z, AD2 LFBO IAC RWY32L FNA\r ILS Y LOC Y, AD2 LFBO IAC RWY32L FNA RNP\r -LNAV-VNAV 32L :\r         LNAV-VNAV\r CAT     DA(H)          RVR     OCH\r A       860(370)       1500       261\r B       870(380)       1500       273\r C       890(400)       1800       292\r D       920(420)       1900       319\r - REF : AD2 LFBO IAC RWY32L FNA RNP\r ILS 14R CAT II/III APCH ARE AUTH ONLY WHEN LVP PROC IS IN PROGRESS \r OR \r IN CASE OF PLANNED TEST. FOR THESE OR IN CASE OF DETERIORATING \r WEATHER, A 15MIN DELAY IS NECESSARY TO PERFORM CAT II/III APCH","id":5271043,"notam_number":"A6457/26","radius_nm":5.0,"raw_text":"OPR MNM CHANGED:\r\n- ILS Z 32L, ILS Y 32L AND LPV 32L:\r\n        ILS Z, ILS Y, LPV\r\nCAT     DA(H)          RVR      OCH\r\nA       760(270)       1300       261\r\nB       770(280)       1300       273\r\nC       780(290)       1400       281\r\nD       790(300)       1400       292\r\nDL     790(300)       1400       292\r\n- REF : AD2 LFBO IAC RWY32L FNA ILS Z LOC Z, AD2 LFBO IAC RWY32L FNA\r\nILS Y LOC Y, AD2 LFBO IAC RWY32L FNA RNP\r\n-LNAV-VNAV 32L :\r\n        LNAV-VNAV\r\nCAT     DA(H)          RVR     OCH\r\nA       860(370)       1500       261\r\nB       870(380)       1500       273\r\nC       890(400)       1800       292\r\nD       920(420)       1900       319\r\n- REF : AD2 LFBO IAC RWY32L FNA RNP\r\nILS 14R CAT II/III APCH ARE AUTH ONLY WHEN LVP PROC IS IN PROGRESS \r\nOR \r\nIN CASE OF PLANNED TEST. FOR THESE OR IN CASE OF DETERIORATING \r\nWEATHER, A 15MIN DELAY IS NECESSARY TO PERFORM CAT II/III APCH","status":"CANCELLED"},"type":"Feature"}