← back

!! NOT FOR OPERATIONAL USE !! data may be stale, incomplete, or wrong


numberV0093/26 NEW
locationFMEE
begin2026-10-01 16:15 UTC (6d ago)
end2026-11-26 00:01 UTC (in 48d)
CADS id5245821
CADS seq12858616
CADS msgNMS_ID_6998293196111325

raw text:

[US DOD PROCEDURAL NOTAM] STANDARD INSTRUMENT DEPARTURE (SID) CHANGED SID RWY 32; INCREASE MINIMUM CLIMB RATE FROM 200 TO 600. ANTIR 5B; MAINTAIN SLOPE OF 6.8 %(414 FPM) UP TO 29 NM SDG TO ENSURE RECEPTION OF SDG THEN THE STANDARD CLIMB. GERAG 5B: MAINTAIN SLOPE OF 6.8 % (414 FPM) UP TO 35 NM SDG TO ENSURE RECEPTION OF SDG THEN STANDARD CLIMB. GETIR 5B: MAINTAIN SLOPE OF 6.8 % (414 FPM) UP TO 29 NM SDG TO ENSURE RECEPTION OF SDG THEN STANDARD CLIMB.

icao text:

V0093/26 NOTAMN 
Q) FMMM/QPICH/I/BO/A/000/999/2053S05530E005 
A) FMEE 
B) 2610011615 
C) 2611260001 
E) [US DOD PROCEDURAL NOTAM] STANDARD INSTRUMENT DEPARTURE (SID) CHANGED SID RWY 32; INCREASE MINIMUM CLIMB RATE FROM 200 TO 600. ANTIR 5B; MAINTAIN SLOPE OF 6.8 %(414 FPM) UP TO 29 NM SDG TO ENSURE RECEPTION OF SDG THEN THE STANDARD CLIMB. GERAG 5B: MAINTAIN SLOPE OF 6.8 % (414 FPM) UP TO 35 NM SDG TO ENSURE RECEPTION OF SDG THEN STANDARD CLIMB. GETIR 5B: MAINTAIN SLOPE OF 6.8 % (414 FPM) UP TO 29 NM SDG TO ENSURE RECEPTION OF SDG THEN STANDARD CLIMB.

downloads:


!! NOT FOR OPERATIONAL USE !! data may be stale, incomplete, or wrong

© 2026 coredoes.dev