{"geometry":{"coordinates":[1.3666666666666667,43.63333333333333],"type":"Point"},"id":5144412,"properties":{"icao_location":"LFBO","icao_text":"A6256/26 NOTAMN\r Q) LFBB/QPICH/I /NBO/A /000/999/4338N00122E005\r A) LFBO B) 2609300500 C) 2610021330\r D) 30 01 0500-1530, 02 0500-1330\r E) OPR MNM:\r - ILS Z 32L, ILS Y 32L ET LPV 32L:       \r CAT     DA(H)          RVR        OCH\r A       760(270)       1300       261\r B       770(280)       1300       273\r C       780(290)       1400       281\r D       790(300)       1400       292\r DL      790(300)       1400       292\r REF: AD2 LFBO IAC RWY32L FNA ILS Z LOC Z, AD2 LFBO IAC RWY32L FNA\r ILS Y LOC Y, AD2 LFBO IAC RWY32L FNA RNP\r -  LNAV-VNAV 32L:       \r CAT     DA(H)          RVR        OCH\r A       860(370)       1500       261\r B       870(380)       1500       273\r C       890(400)       1800       292\r D       920(420)       1900       319\r REF: AD2 LFBO IAC RWY32L FNA RNP\r ILS 14R CAT 2-3 APCH ARE AUTH ONLY WHEN LVP PROC IS IN PROGRESS OR \r IN CASE OF PLANNED TEST. FOR THESE OR IN CASE OF DETERIORATING \r WEATHER, A 15MIN DELAY IS NECESSARY TO PERFORM CAT 2-3 APCH","id":5144412,"notam_number":"A6256/26","radius_nm":5.0,"raw_text":"OPR MNM:\r\n- ILS Z 32L, ILS Y 32L ET LPV 32L:       \r\nCAT     DA(H)          RVR        OCH\r\nA       760(270)       1300       261\r\nB       770(280)       1300       273\r\nC       780(290)       1400       281\r\nD       790(300)       1400       292\r\nDL      790(300)       1400       292\r\nREF: AD2 LFBO IAC RWY32L FNA ILS Z LOC Z, AD2 LFBO IAC RWY32L FNA\r\nILS Y LOC Y, AD2 LFBO IAC RWY32L FNA RNP\r\n-  LNAV-VNAV 32L:       \r\nCAT     DA(H)          RVR        OCH\r\nA       860(370)       1500       261\r\nB       870(380)       1500       273\r\nC       890(400)       1800       292\r\nD       920(420)       1900       319\r\nREF: AD2 LFBO IAC RWY32L FNA RNP\r\nILS 14R CAT 2-3 APCH ARE AUTH ONLY WHEN LVP PROC IS IN PROGRESS OR \r\nIN CASE OF PLANNED TEST. FOR THESE OR IN CASE OF DETERIORATING \r\nWEATHER, A 15MIN DELAY IS NECESSARY TO PERFORM CAT 2-3 APCH","status":"CANCELLED"},"type":"Feature"}