← back

!! NOT FOR OPERATIONAL USE !! data may be stale, incomplete, or wrong


numberB0740/26 CANCELLED
locationBGSS
begin2026-09-21 16:03 UTC (16d ago)
end2026-10-22 13:00 UTC (in 14d)
CADS id5141715
CADS seq-
CADS msgNMS_ID_1790006620636000

raw text:

SISIMIUT AIRPORT IS EQUIPPED WITH A NEW TURBULENCE WARNING
SYSTEM. THE SYSTEM IS IN A TEST PHASE. TO ENSURE ADAPTATION OF THE
SYSTEM, ALL PILOTS MUST REPORT THE LEVEL OF EXPERIENCED TURBULENCE
BELOW 2000 FEET TO SISIMIUT AFIS AS SOON AS PRACTICABLE AFTER
LANDING OR TAKE-OFF, REGARDLESS OF INTENSITY, FOR THE DURATION OF
THE TEST PHASE.

icao text:

B0740/26 NOTAMN
 Q) BGGL/QFAXX/IV/NBO/A /000/999/6657N05344W005
 A) BGSS B) 2609211603 C) 2610221300
 E) SISIMIUT AIRPORT IS EQUIPPED WITH A NEW TURBULENCE WARNING
 SYSTEM. THE SYSTEM IS IN A TEST PHASE. TO ENSURE ADAPTATION OF THE
 SYSTEM, ALL PILOTS MUST REPORT THE LEVEL OF EXPERIENCED TURBULENCE
 BELOW 2000 FEET TO SISIMIUT AFIS AS SOON AS PRACTICABLE AFTER
 LANDING OR TAKE-OFF, REGARDLESS OF INTENSITY, FOR THE DURATION OF
 THE TEST PHASE.

downloads:


!! NOT FOR OPERATIONAL USE !! data may be stale, incomplete, or wrong

© 2026 coredoes.dev