{"geometry":{"coordinates":[23.95,37.93333333333333],"type":"Point"},"id":5068599,"properties":{"icao_location":"LGAV","icao_text":"A3310/26 NOTAMN\r Q) LGGG/QMRLT/IV/NBO/A /000/999/3756N02357E005\r A) LGAV B) 2609222100 C) 2611042159\r E) PHASE B OF ASPHALT RENEWAL AND AGL UPGRADEWORKS IN PROGRESS. RWY\r 03L/21R OPERATIONAL ONLY FOR DEPARTURES WITH REDUSED RWY LENGTH DUE \r TO WIP. CAUTION ADVISED. REF AIP SUP 45/2026.","id":5068599,"notam_number":"A3310/26","radius_nm":5.0,"raw_text":"PHASE B OF ASPHALT RENEWAL AND AGL UPGRADEWORKS IN PROGRESS. RWY\r\n03L/21R OPERATIONAL ONLY FOR DEPARTURES WITH REDUSED RWY LENGTH DUE \r\nTO WIP. CAUTION ADVISED. REF AIP SUP 45/2026.","status":"CANCELLED"},"type":"Feature"}