← back

!! NOT FOR OPERATIONAL USE !! data may be stale, incomplete, or wrong


numberA5274/26 CANCELLED
locationLPFR
begin2026-09-08 14:29 UTC (28d ago)
end-
CADS id5063676
CADS seq-
CADS msgNMS_ID_1788877862858643

raw text:

SECONDARY POWER SUPPLY: DURING NORMAL VISIBILITY OPERATIONS 
(NVO), THE LPFR SECONDARY GENERATORS PROVIDE AN ALTERNATIVE POWER 
SUPPLY WITH A SWITCH-OVER TIME OF LESS THAN 15 SECONDS. DURING LOW 
VISIBILITY OPERATIONS (LVO), ONE POWER SUPPLY GENERATOR OPERATES AS 
THE PRIMARY POWER SOURCE, WHILE THE NATIONAL POWER GRID OR THE 
SECOND LPFR GENERATOR ACTS AS THE STANDBY POWER SOURCE, ENSURING A 
SWITCH-OVER TIME OF LESS THAN 1 SECOND.
REF AIP LPFR AD 2.15

icao text:

A5274/26 NOTAMN
Q) LPPC/QFAXX/IV/NBO/A /000/999/3701N00758W005
A) LPFR B) 2609081429 C) PERM
E) SECONDARY POWER SUPPLY: DURING NORMAL VISIBILITY OPERATIONS 
(NVO), THE LPFR SECONDARY GENERATORS PROVIDE AN ALTERNATIVE POWER 
SUPPLY WITH A SWITCH-OVER TIME OF LESS THAN 15 SECONDS. DURING LOW 
VISIBILITY OPERATIONS (LVO), ONE POWER SUPPLY GENERATOR OPERATES AS 
THE PRIMARY POWER SOURCE, WHILE THE NATIONAL POWER GRID OR THE 
SECOND LPFR GENERATOR ACTS AS THE STANDBY POWER SOURCE, ENSURING A 
SWITCH-OVER TIME OF LESS THAN 1 SECOND.
REF AIP LPFR AD 2.15

downloads:


!! NOT FOR OPERATIONAL USE !! data may be stale, incomplete, or wrong

© 2026 coredoes.dev