!! NOT FOR OPERATIONAL USE !! data may be stale, incomplete, or wrong
| number | A5274/26 CANCELLED |
| location | LPFR |
| begin | 2026-09-08 14:29 UTC (28d ago) |
| end | - |
| CADS id | 5063676 |
| CADS seq | - |
| CADS msg | NMS_ID_1788877862858643 |
raw text:
SECONDARY POWER SUPPLY: DURING NORMAL VISIBILITY OPERATIONS (NVO), THE LPFR SECONDARY GENERATORS PROVIDE AN ALTERNATIVE POWER SUPPLY WITH A SWITCH-OVER TIME OF LESS THAN 15 SECONDS. DURING LOW VISIBILITY OPERATIONS (LVO), ONE POWER SUPPLY GENERATOR OPERATES AS THE PRIMARY POWER SOURCE, WHILE THE NATIONAL POWER GRID OR THE SECOND LPFR GENERATOR ACTS AS THE STANDBY POWER SOURCE, ENSURING A SWITCH-OVER TIME OF LESS THAN 1 SECOND. REF AIP LPFR AD 2.15
icao text:
A5274/26 NOTAMN Q) LPPC/QFAXX/IV/NBO/A /000/999/3701N00758W005 A) LPFR B) 2609081429 C) PERM E) SECONDARY POWER SUPPLY: DURING NORMAL VISIBILITY OPERATIONS (NVO), THE LPFR SECONDARY GENERATORS PROVIDE AN ALTERNATIVE POWER SUPPLY WITH A SWITCH-OVER TIME OF LESS THAN 15 SECONDS. DURING LOW VISIBILITY OPERATIONS (LVO), ONE POWER SUPPLY GENERATOR OPERATES AS THE PRIMARY POWER SOURCE, WHILE THE NATIONAL POWER GRID OR THE SECOND LPFR GENERATOR ACTS AS THE STANDBY POWER SOURCE, ENSURING A SWITCH-OVER TIME OF LESS THAN 1 SECOND. REF AIP LPFR AD 2.15
downloads:
!! NOT FOR OPERATIONAL USE !! data may be stale, incomplete, or wrong
© 2026 coredoes.dev