{"geometry":{"coordinates":[-7.966666666666667,37.016666666666666],"type":"Point"},"id":4987124,"properties":{"icao_location":"LPFR","icao_text":"A5274/26 NOTAMN\r Q) LPPC/QFAXX/IV/NBO/A /000/999/3701N00758W005\r A) LPFR B) 2609081429 C) PERM\r E) SECONDARY POWER SUPPLY: DURING NORMAL VISIBILITY OPERATIONS \r (NVO), THE LPFR SECONDARY GENERATORS PROVIDE AN ALTERNATIVE POWER \r SUPPLY WITH A SWITCH-OVER TIME OF LESS THAN 15 SECONDS. DURING LOW \r VISIBILITY OPERATIONS (LVO), ONE POWER SUPPLY GENERATOR OPERATES AS \r THE PRIMARY POWER SOURCE, WHILE THE NATIONAL POWER GRID OR THE \r SECOND LPFR GENERATOR ACTS AS THE STANDBY POWER SOURCE, ENSURING A \r SWITCH-OVER TIME OF LESS THAN 1 SECOND.\r REF AIP LPFR AD 2.15","id":4987124,"notam_number":"A5274/26","radius_nm":5.0,"raw_text":"SECONDARY POWER SUPPLY: DURING NORMAL VISIBILITY OPERATIONS \r\n(NVO), THE LPFR SECONDARY GENERATORS PROVIDE AN ALTERNATIVE POWER \r\nSUPPLY WITH A SWITCH-OVER TIME OF LESS THAN 15 SECONDS. DURING LOW \r\nVISIBILITY OPERATIONS (LVO), ONE POWER SUPPLY GENERATOR OPERATES AS \r\nTHE PRIMARY POWER SOURCE, WHILE THE NATIONAL POWER GRID OR THE \r\nSECOND LPFR GENERATOR ACTS AS THE STANDBY POWER SOURCE, ENSURING A \r\nSWITCH-OVER TIME OF LESS THAN 1 SECOND.\r\nREF AIP LPFR AD 2.15","status":"CANCELLED"},"type":"Feature"}