← back

!! NOT FOR OPERATIONAL USE !! data may be stale, incomplete, or wrong


numberA1689/26 CANCELLED
locationVHHK
begin2026-07-27 17:00 UTC (10d ago)
end2026-07-28 02:00 UTC (10d ago)
CADS id3965354
CADS seq11429501
CADS msgNMS_ID_1785161455790000

raw text:

DUE TO WEATHER IN HONG KONG FIR,

1. ALL TRAFFIC VIA A1 IKELA TO ENVAR TO DESTINATIONS WITHIN INCHEON 
FIR: 
20NM AND 40NM LONGITUDINAL SPACING ARE SUSPENDED,
12 MINUTES LONGITUDINAL SPACING IN THE CASE OF CATCHING 
UP TRAFFIC SHALL BE APPLIED.

2. OTHER EASTBOUND TRAFFIC VIA A1 IKELA:
20NM AND 40NM LONGITUDINAL SPACING ARE SUSPENDED,
5 MINUTES OR 7 MINUTES LONGITUDINAL SPACING IN THE CASE OF CATCHING 
UP TRAFFIC SHALL BE APPLIED.

2. ALL TRAFFIC VIA G86 KAPLI TO IKELA A1:
20NM AND 40NM LONGITUDINAL SPACING ARE SUSPENDED,
5 MINUTES OR 7 MINUTES LONGITUDINAL SPACING IN THE CASE OF CATCHING 
UP TRAFFIC SHALL BE APPLIED

RMK: FLOW CONTROL MAY BE ADJUSTED SUBJECT TO SITUATION AND 
DISCRETION OF HONG KONG ATS WATCH SUPERVISOR.

icao text:

A1689/26 NOTAMN
 Q) VHHK/QPFCA/IV/NBO/E /000/999/2003N11500E214
 A) VHHK B) 2607271700 C) 2607280200EST
 E) DUE TO WEATHER IN HONG KONG FIR,
 
 1. ALL TRAFFIC VIA A1 IKELA TO ENVAR TO DESTINATIONS WITHIN INCHEON 
 FIR: 
 20NM AND 40NM LONGITUDINAL SPACING ARE SUSPENDED,
 12 MINUTES LONGITUDINAL SPACING IN THE CASE OF CATCHING 
 UP TRAFFIC SHALL BE APPLIED.
 
 2. OTHER EASTBOUND TRAFFIC VIA A1 IKELA:
 20NM AND 40NM LONGITUDINAL SPACING ARE SUSPENDED,
 5 MINUTES OR 7 MINUTES LONGITUDINAL SPACING IN THE CASE OF CATCHING 
 UP TRAFFIC SHALL BE APPLIED.
 
 2. ALL TRAFFIC VIA G86 KAPLI TO IKELA A1:
 20NM AND 40NM LONGITUDINAL SPACING ARE SUSPENDED,
 5 MINUTES OR 7 MINUTES LONGITUDINAL SPACING IN THE CASE OF CATCHING 
 UP TRAFFIC SHALL BE APPLIED
 
 RMK: FLOW CONTROL MAY BE ADJUSTED SUBJECT TO SITUATION AND 
 DISCRETION OF HONG KONG ATS WATCH SUPERVISOR.

downloads:


!! NOT FOR OPERATIONAL USE !! data may be stale, incomplete, or wrong

© 2026 coredoes.dev