← back

!! NOT FOR OPERATIONAL USE !! data may be stale, incomplete, or wrong


numberF1602/26 CANCELLED
locationLFMM
begin2026-07-27 17:30 UTC (12d ago)
end2026-07-27 23:59 UTC (12d ago)
CADS id3959217
CADS seq11423364
CADS msgNMS_ID_1785141876914000

raw text:

DUE TO PRIOR STRIKE DECLARATIONS BY SOME AIR TRAFFIC CONTROLLERS 
OF 'DSNA' AT MARSEILLE ACC EAST SECTORS (SECTORS A1, A2, A3, A4, AJ, 
B1, B2, B3, B4, BT, E1, E2, E3, G1, G2, G3, G4, K1, K2, K3, MN, ST, 
Y1, Y2, Y3, Y4 PUBLISHED IN AIP), A REDUCTION IN CONTROL CAPACITY IS 
EXPECTED. ONE FEWER CONTROL SECTOR WILL BE AVAILABLE COMPARED TO THE 
INITIALLY PLANNED CONFIGURATION DURING THE PERIOD OF VALIDITY OF 
NOTAM.
-RMK 1 : INFORMATION ON THE REAL-TIME SITUATION WILL BE AVAILABLE ON
THE FOLLOWING INTERNET WEBSITE : HTTPS://CDM.DSNA.FR 
-RMK 2 : ADDITIONAL NOTAM WILL BE SENT IF NEEDED DEPENDING ON THE
EVOLUTION OF THE SITUATION.

icao text:

F1602/26 NOTAMN
 Q) LFMM/QAFXX/IV/NBO/E /000/999/4358N00642E212
 A) LFMM B) 2607271730 C) 2607272359
 E) DUE TO PRIOR STRIKE DECLARATIONS BY SOME AIR TRAFFIC CONTROLLERS 
 OF 'DSNA' AT MARSEILLE ACC EAST SECTORS (SECTORS A1, A2, A3, A4, AJ, 
 B1, B2, B3, B4, BT, E1, E2, E3, G1, G2, G3, G4, K1, K2, K3, MN, ST, 
 Y1, Y2, Y3, Y4 PUBLISHED IN AIP), A REDUCTION IN CONTROL CAPACITY IS 
 EXPECTED. ONE FEWER CONTROL SECTOR WILL BE AVAILABLE COMPARED TO THE 
 INITIALLY PLANNED CONFIGURATION DURING THE PERIOD OF VALIDITY OF 
 NOTAM.
 -RMK 1 : INFORMATION ON THE REAL-TIME SITUATION WILL BE AVAILABLE ON
 THE FOLLOWING INTERNET WEBSITE : HTTPS://CDM.DSNA.FR 
 -RMK 2 : ADDITIONAL NOTAM WILL BE SENT IF NEEDED DEPENDING ON THE
 EVOLUTION OF THE SITUATION.

downloads:


!! NOT FOR OPERATIONAL USE !! data may be stale, incomplete, or wrong

© 2026 coredoes.dev