!! NOT FOR OPERATIONAL USE !! data may be stale, incomplete, or wrong
| number | A0921/26 CANCELLED |
| location | NTAA |
| begin | 2026-07-16 18:00 UTC (22d ago) |
| end | 2026-07-18 03:00 UTC (20d ago) |
| CADS id | 3619276 |
| CADS seq | 11035423 |
| CADS msg | NMS_ID_1783477875939000 |
raw text:
CANAL DREDGING WORK ON THE SOUTH CLEARED STRIPS OF TWY SIERRA TO WEST OF GLIDE - WORK PROGRAMMED OUTSIDE HEAVY-WEIGHT FLIGHTS - PRESENCE OF A DREDGER WITH A 14-METER LONG ARM AND A TRUCK AT 120 METERS SOUTH OF THE RWY - GLIDE UNAVAILABLE WHEN THE WORK IS WEST OF THE GLIDE, UNAVAILIBILITY ANNOUCED ON ATIS. DME PT STILL AVAILABLE - FALL-BACK DELAY : 10 MINUTES - INFRA 1 IN PERMANENT RADIO CONTACT WITH TWR THE FRENCH VERSION OF THIS NOTAM IS C1652/26
icao text:
A0921/26 NOTAMN Q) NTTT/QIGAU/IV/NBO/A/000/999/1733S14936W005 A) NTAA B) 2607161800 C) 2607180300 D) 1800 0300 E) CANAL DREDGING WORK ON THE SOUTH CLEARED STRIPS OF TWY SIERRA TO WEST OF GLIDE - WORK PROGRAMMED OUTSIDE HEAVY-WEIGHT FLIGHTS - PRESENCE OF A DREDGER WITH A 14-METER LONG ARM AND A TRUCK AT 120 METERS SOUTH OF THE RWY - GLIDE UNAVAILABLE WHEN THE WORK IS WEST OF THE GLIDE, UNAVAILIBILITY ANNOUCED ON ATIS. DME PT STILL AVAILABLE - FALL-BACK DELAY : 10 MINUTES - INFRA 1 IN PERMANENT RADIO CONTACT WITH TWR THE FRENCH VERSION OF THIS NOTAM IS C1652/26
downloads:
!! NOT FOR OPERATIONAL USE !! data may be stale, incomplete, or wrong
© 2026 coredoes.dev