{"geometry":{"coordinates":[121.33333333333333,31.2],"type":"Point"},"id":3504177,"properties":{"icao_location":"ZSSS","icao_text":"\n(F2391/26 NOTAMR F8592/25 \nQ)ZSHA/QXXXX/IV/NBO/AE/000/999/3112N12120E005 \nA)ZSSS B)2606180633 C)2612311559 EST \nE) IMPLEMENT THE LID(LANDING INFORMATION DELIVER) OPERATION \nTRIAL.THE BASIC LID PROCEDURE AS FOLLOW: \n1.SHANGHAI APPROACH WILL ISSUE THE LID MESSAGE BY DATA-LINK TO \nARRIVAL FLIGHTS TO ZSSS 50 MINUTES BEFORE LANDING; \n2.THE LID INFORMATION WILL INCLUDE EXPECTED ARRIVAL PROCEDURE, \nAPPROACH METHOD, LANDING RUNWAY, AND PARKING STAND; \n3.PILOT CAN DIRECTLY USE THE LID INFORMATION FOR FMS PREPARATION \nDURING CRUISE PHASE WITHOUT RADIO CONFIRMATION BY ACC; \n4.ON INITIAL CONTACT SHANGHAI APPROACH,PILOT SHOULD ADVISE YOUR \nLID INFORMATION AT LEAST INCLUDING EXPECTED ARRIVAL PROCEDURE, \nAPPROACH METHOD, AND LANDING RUNWAY; \n5.SHANGHAI APPROACH WILL CONFIRM OR MODIFY FROM PILOT LID REPORT: \n6.AFTER ESTABLISH RADIO COMMUNICATION WITH SHANGHAI APPROACH, ALL \nTHE LANDING INFORMATION SHOULD BE JUST FOLLOWED THE INSTRUCTION BY \nCONTROLLER FOR ANY POSSIBLE CHANGE; \n7.IF PILOT DO NOT RECEIVE THE LID INFORMATION, PILOT SHOULD FOLLOW \nTHE CURRENT PROCEDURE; \n8.FOR BETTER IMPROVE THE \n ) \n// // LID SERVICE, PLEASE FEEL FREE TO TELL US YOUR SUGGESTION AND \nCOMMENTS TO EMAIL: \nSUNY1(A)ATMB.NET.CN \n \n ) \n// //\n","id":3504177,"notam_number":"F2391/26","radius_nm":5.0,"raw_text":"IMPLEMENT THE LID(LANDING INFORMATION DELIVER) OPERATION \nTRIAL.THE BASIC LID PROCEDURE AS FOLLOW: \n1.SHANGHAI APPROACH WILL ISSUE THE LID MESSAGE BY DATA-LINK TO \nARRIVAL FLIGHTS TO ZSSS 50 MINUTES BEFORE LANDING; \n2.THE LID INFORMATION WILL INCLUDE EXPECTED ARRIVAL PROCEDURE, \nAPPROACH METHOD, LANDING RUNWAY, AND PARKING STAND; \n3.PILOT CAN DIRECTLY USE THE LID INFORMATION FOR FMS PREPARATION \nDURING CRUISE PHASE WITHOUT RADIO CONFIRMATION BY ACC; \n4.ON INITIAL CONTACT SHANGHAI APPROACH,PILOT SHOULD ADVISE YOUR \nLID INFORMATION AT LEAST INCLUDING EXPECTED ARRIVAL PROCEDURE, \nAPPROACH METHOD, AND LANDING RUNWAY; \n5.SHANGHAI APPROACH WILL CONFIRM OR MODIFY FROM PILOT LID REPORT: \n6.AFTER ESTABLISH RADIO COMMUNICATION WITH SHANGHAI APPROACH, ALL \nTHE LANDING INFORMATION SHOULD BE JUST FOLLOWED THE INSTRUCTION BY \nCONTROLLER FOR ANY POSSIBLE CHANGE; \n7.IF PILOT DO NOT RECEIVE THE LID INFORMATION, PILOT SHOULD FOLLOW \nTHE CURRENT PROCEDURE; \n8.FOR BETTER IMPROVE THE \n ) \n// // LID SERVICE, PLEASE FEEL FREE TO TELL US YOUR SUGGESTION AND \nCOMMENTS TO EMAIL: \nSUNY1(A)ATMB.NET.CN \n \n ) \n// //","status":"CANCELLED"},"type":"Feature"}