{"geometry":{"coordinates":[121.8,31.15],"type":"Point"},"id":3256128,"properties":{"icao_location":"ZSPD","icao_text":"(F2392/26 NOTAMR F8593/25  Q)ZSHA/QXXXX/IV/NBO/AE/000/999/3109N12148E005  A)ZSPD B)2606180633 C)2612311559 EST  E) IMPLEMENT THE LID(LANDING INFORMATION DELIVER) OPERATION  TRIAL.THE BASIC LID PROCEDURE AS FOLLOW:  1.SHANGHAI APPROACH WILL ISSUE THE LID MESSAGE BY DATA-LINK TO  ARRIVAL FLIGHTS TO ZSPD 50 MINUTES BEFORE LANDING;  2.THE LID INFORMATION WILL INCLUDE EXPECTED ARRIVAL PROCEDURE,  APPROACH METHOD, LANDING RUNWAY AND PARKING STAND.  3.PILOT CAN DIRECTLY USE THE LID INFORMATION FOR FMS PREPARATION  DURING CRUISE PHASE WITHOUT RADIO CONFIRMATION BY ACC;  4.ON INITIAL CONTACT SHANGHAI APPROACH,PILOT SHOULD ADVISE YOUR  LID INFORMATION AT LEAST INCLUDING EXPECTED ARRIVAL PROCEDURE,  APPROACH METHOD, AND LANDING RUNWAY;  5.SHANGHAI APPROACH WILL CONFIRM OR MODIFY FROM PILOT LID REPORT:  6.AFTER ESTABLISH RADIO COMMUNICATION WITH SHANGHAI APPROACH, ALL  THE LANDING INFORMATION SHOULD BE JUST FOLLOWED THE INSTRUCTION BY  CONTROLLER FOR ANY POSSIBLE CHANGE;  7.IF PILOT DO NOT RECEIVE THE LID INFORMATION, PILOT SHOULD FOLLOW  THE CURRENT PROCEDURE;  8.FOR BETTER IMPROVE THE LID   )  // // SERVICE, PLEASE FEEL FREE TO TELL US YOUR SUGGESTION AND  COMMENTS TO EMAIL:  SUNY1(A)ATMB.NET.CN   )  // //","id":3256128,"notam_number":"F2392/26","radius_nm":5.0,"raw_text":"IMPLEMENT THE LID(LANDING INFORMATION DELIVER) OPERATION \nTRIAL.THE BASIC LID PROCEDURE AS FOLLOW: \n1.SHANGHAI APPROACH WILL ISSUE THE LID MESSAGE BY DATA-LINK TO \nARRIVAL FLIGHTS TO ZSPD 50 MINUTES BEFORE LANDING; \n2.THE LID INFORMATION WILL INCLUDE EXPECTED ARRIVAL PROCEDURE, \nAPPROACH METHOD, LANDING RUNWAY AND PARKING STAND. \n3.PILOT CAN DIRECTLY USE THE LID INFORMATION FOR FMS PREPARATION \nDURING CRUISE PHASE WITHOUT RADIO CONFIRMATION BY ACC; \n4.ON INITIAL CONTACT SHANGHAI APPROACH,PILOT SHOULD ADVISE YOUR \nLID INFORMATION AT LEAST INCLUDING EXPECTED ARRIVAL PROCEDURE, \nAPPROACH METHOD, AND LANDING RUNWAY; \n5.SHANGHAI APPROACH WILL CONFIRM OR MODIFY FROM PILOT LID REPORT: \n6.AFTER ESTABLISH RADIO COMMUNICATION WITH SHANGHAI APPROACH, ALL \nTHE LANDING INFORMATION SHOULD BE JUST FOLLOWED THE INSTRUCTION BY \nCONTROLLER FOR ANY POSSIBLE CHANGE; \n7.IF PILOT DO NOT RECEIVE THE LID INFORMATION, PILOT SHOULD FOLLOW \nTHE CURRENT PROCEDURE; \n8.FOR BETTER IMPROVE THE LID \n ) \n// // SERVICE, PLEASE FEEL FREE TO TELL US YOUR SUGGESTION AND \nCOMMENTS TO EMAIL: \nSUNY1(A)ATMB.NET.CN \n ) \n// //","status":"CANCELLED"},"type":"Feature"}