← back

!! NOT FOR OPERATIONAL USE !! data may be stale, incomplete, or wrong


numberA0403/26 CANCELLED
locationBIRD
begin2026-06-10 14:36 UTC (57d ago)
end2026-08-01 23:59 UTC (5d ago)
CADS id3224910
CADS seq-
CADS msgNMS_ID_1781102289351000

raw text:

WIND TURBINE FARM UNDER CONSTRUCTION.
WIND TURBINES ERECTED AT VADALDA, RANGARTHING YTRA. 
TWO WIND TURBINE HAS BEEN ERECTED, 2 MORE UNDER CONSTRUCTION.
ADDITIONAL 11 WIND TURBINES TO
BE ERECTED FROM JUNE 2026 - TOTAL 14 TURBINES. TOTAL AREA APPROX
BOUNDED BY
COORDINATES:
640915.84N 0192840.80W
640927.72N 0192712.96W
641056.28N 0192551.96W
641109.24N 0193150.16W
640918.00N 0193028.08W
641011.64N 0193107.68W
HEIGHT 492.13 FT AGL. 
ELEVATION 984.25 FT AMSL. 
SEE AIP SUP 06/2026.

icao text:

A0403/26 NOTAMR A0289/26
 Q) BIRD/QOBCE/IV/M  /E /000/010/6411N01929W002
 A) BIRD B) 2606101436 C) 2608012359
 E) WIND TURBINE FARM UNDER CONSTRUCTION.
 WIND TURBINES ERECTED AT VADALDA, RANGARTHING YTRA. 
 TWO WIND TURBINE HAS BEEN ERECTED, 2 MORE UNDER CONSTRUCTION.
 ADDITIONAL 11 WIND TURBINES TO
 BE ERECTED FROM JUNE 2026 - TOTAL 14 TURBINES. TOTAL AREA APPROX
 BOUNDED BY
 COORDINATES:
 640915.84N 0192840.80W
 640927.72N 0192712.96W
 641056.28N 0192551.96W
 641109.24N 0193150.16W
 640918.00N 0193028.08W
 641011.64N 0193107.68W
 HEIGHT 492.13 FT AGL. 
 ELEVATION 984.25 FT AMSL. 
 SEE AIP SUP 06/2026.

downloads:


!! NOT FOR OPERATIONAL USE !! data may be stale, incomplete, or wrong

© 2026 coredoes.dev