{"geometry":{"coordinates":[6.75,51.28333333333333],"type":"Point"},"id":2993456,"properties":{"icao_location":"EDDL","icao_text":"A2981/26 NOTAMN\r Q) EDGG/QFAXX/I /NBO/A /000/999/5117N00645E005\r A) EDDL B) 2606220800 C) 2606242359\r E) EDDL WILL PERMANENTLY ESTABLISH AN AUTOMATIC DATA EXCHANGE WITH \r THE NETWORK MANAGER EUROCONTROL AS AN ANI AIRPORT (ADVANCED NETWORK\r INTEGRATED), IN ADDITION TO THE EXISTING A-CDM (AIRPORT-COLLABORATIVE\r DECISION MAKING) MESSAGE EXCHANGE. THE TRANSMISSION OF P-DPI\r (PREDICTED DEPARTURE PLANNING INFORMATION) AND G-API (GENERAL \r ARRIVAL PLANNING INFORMATION) MESSAGES BEGINS AS MUCH AS 48 HOURS \r BEFORE EOBT/SOBT.","id":2993456,"notam_number":"A2981/26","radius_nm":5.0,"raw_text":"EDDL WILL PERMANENTLY ESTABLISH AN AUTOMATIC DATA EXCHANGE WITH \r\nTHE NETWORK MANAGER EUROCONTROL AS AN ANI AIRPORT (ADVANCED NETWORK\r\nINTEGRATED), IN ADDITION TO THE EXISTING A-CDM (AIRPORT-COLLABORATIVE\r\nDECISION MAKING) MESSAGE EXCHANGE. THE TRANSMISSION OF P-DPI\r\n(PREDICTED DEPARTURE PLANNING INFORMATION) AND G-API (GENERAL \r\nARRIVAL PLANNING INFORMATION) MESSAGES BEGINS AS MUCH AS 48 HOURS \r\nBEFORE EOBT/SOBT.","status":"NEW"},"type":"Feature"}