← back

!! NOT FOR OPERATIONAL USE !! data may be stale, incomplete, or wrong


numberA1130/26 CANCELLED
locationVHHK
begin2026-05-29 16:30 UTC (9d ago)
end2026-05-30 01:00 UTC (9d ago)
CADS id2790642
CADS seq-
CADS msgNMS_ID_1780071530507000

raw text:

DUE TO BAD WEATHER IN HONG KONG FIR,

1. ALL TRAFFIC VIA A1 IKELA EASTBOUND:
20NM AND 40NM LONGITUDINAL SPACING ARE SUSPENDED
5 MINUTES OR 7 MINUTES LONGITUDINAL SPACING IN THE CASE OF CATCHING 
UP TRAFFIC SHALL BE APPLIED

2. ALL TRAFFIC VIA A1 IKELA TO ENVAR TO DESTINATIONS WITHIN INCHEON 
FIR:
20NM AND 40NM LONGITUDINAL SPACING IS SUSPENDED
12 MINUTES LONGITUDINAL SPACING IN THE CASE OF CATCHING UP TRAFFIC 
SHALL BE APPLIED

3. ALL TRAFFIC VIA G86 KAPLI WESTBOUND:
20NM AND 40NM LONGITUDINAL SPACING ARE SUSPENDED
5 MINUTES OR 7 MINUTES LONGITUDINAL SPACING IN THE CASE OF CATCHING 
UP TRAFFIC SHALL BE APPLIED

RMK: FLOW CONTROL MAY BE ADJUSTED SUBJECT TO SITUATION AND 
DISCRETION OF HONG KONG ATS WATCH SUPERVISOR.

icao text:

A1130/26 NOTAMN
Q) VHHK/QPFCA/IV/NBO/E /000/999/2003N11500E214
A) VHHK B) 2605291630 C) 2605300100
E) DUE TO BAD WEATHER IN HONG KONG FIR,

1. ALL TRAFFIC VIA A1 IKELA EASTBOUND:
20NM AND 40NM LONGITUDINAL SPACING ARE SUSPENDED
5 MINUTES OR 7 MINUTES LONGITUDINAL SPACING IN THE CASE OF CATCHING 
UP TRAFFIC SHALL BE APPLIED

2. ALL TRAFFIC VIA A1 IKELA TO ENVAR TO DESTINATIONS WITHIN INCHEON 
FIR:
20NM AND 40NM LONGITUDINAL SPACING IS SUSPENDED
12 MINUTES LONGITUDINAL SPACING IN THE CASE OF CATCHING UP TRAFFIC 
SHALL BE APPLIED

3. ALL TRAFFIC VIA G86 KAPLI WESTBOUND:
20NM AND 40NM LONGITUDINAL SPACING ARE SUSPENDED
5 MINUTES OR 7 MINUTES LONGITUDINAL SPACING IN THE CASE OF CATCHING 
UP TRAFFIC SHALL BE APPLIED

RMK: FLOW CONTROL MAY BE ADJUSTED SUBJECT TO SITUATION AND 
DISCRETION OF HONG KONG ATS WATCH SUPERVISOR.

downloads:


!! NOT FOR OPERATIONAL USE !! data may be stale, incomplete, or wrong

© 2026 coredoes.dev