{"geometry":{"coordinates":[132.23333333333332,34.13333333333333],"type":"Point"},"id":2751025,"properties":{"icao_location":"RJOI","icao_text":"M0534/26 NOTAMN \r\nQ) RJJJ/QMXTT/IV/NBO/A/000/999/3408N13214E005 \r\nA) RJOI \r\nB) 2606021400 \r\nC) 2606191400 \r\nE) CAUTION: CONSTRUCTION HAZARD ON WEST SIDE OF TAXIWAY CHARLIE CENTERLINE. AREA MARKED WITH LOW-PROFILE BARRICADES. TAXIING ON EAST SIDE OF TAXIWAY CHARLIE IS REQUIRED UNTIL NEW CONCRETE SLABS ARE POURED AND FULLY CURED. EXERCISE CAUTION WHILE TAXIING. C-130 ENGINE RUNS MUST BE CONDUCTED ON RUNWAY ENDS UNTIL TAXIWAY CHARLIE PAVEMENT IS CURED.","id":2751025,"notam_number":"M0534/26","radius_nm":5.0,"raw_text":"CAUTION: CONSTRUCTION HAZARD ON WEST SIDE OF TAXIWAY CHARLIE CENTERLINE. AREA MARKED WITH LOW-PROFILE BARRICADES. TAXIING ON EAST SIDE OF TAXIWAY CHARLIE IS REQUIRED UNTIL NEW CONCRETE SLABS ARE POURED AND FULLY CURED. EXERCISE CAUTION WHILE TAXIING. C-130 ENGINE RUNS MUST BE CONDUCTED ON RUNWAY ENDS UNTIL TAXIWAY CHARLIE PAVEMENT IS CURED.","status":"CANCELLED"},"type":"Feature"}