{"geometry":{"coordinates":[100.51666666666667,5.183333333333334],"type":"Point"},"id":2211110,"properties":{"icao_location":"WMKB","icao_text":"A1051/26 NOTAMN\r Q) WMFC/QWULW/IV/BO/AW/000/005/0511N10032E004\r A) WMKB\r B) 2604010000 C) 2606301000\r D) 0000-1000\r E) UA ACT WILL TAKE PLACE ALONG THE PETRONAS GAS PIPELINE FM:\r    051412.00N 1003220.00E - 051233.00N 1003212.00E -\r    051003.00N 1003158.00E - 050830.00N 1003126.00E \r    (PETRONAS GAS PIPELINE PENANG AREA 2)\r F) SFC G) 400FT AGL)","id":2211110,"notam_number":"A1051/26","radius_nm":2.0,"raw_text":"UA ACT WILL TAKE PLACE ALONG THE PETRONAS GAS PIPELINE FM:\r\n   051412.00N 1003220.00E - 051233.00N 1003212.00E -\r\n   051003.00N 1003158.00E - 050830.00N 1003126.00E \r\n   (PETRONAS GAS PIPELINE PENANG AREA 2)\r\nF) SFC","status":"CANCELLED"},"type":"Feature"}