← back

!! NOT FOR OPERATIONAL USE !! data may be stale, incomplete, or wrong


numberA0084/26 CANCELLED
locationLSGG
begin2026-02-05 09:00 UTC (69d ago)
end2026-05-06 09:00 UTC (in 20d)
CADS id17241
CADS seq-
CADS msgNMS_ID_1769583578891221

raw text:

AP COLLABORATIVE DECISION MAKING (ACDM) PERM CONNECTED WITH
NETWORK MANAGEMENT OPS CENTRE. 
DEP PLANNING INFO MSG WITH FLT DATA SENT TO OPR NETWORK 
MANAGEMENT SYSTEM. FLT CREW REQUIRED TO CTC ATC FOR DEP CLR WI 
VALID TARGET OFF-BLOCK TIME (TOBT) -15/+5 MIN.
WHEN FLT IS READY OUTSIDE TOBT WINDOW, FLT CREW SHALL CTC GND
HANDLER BEFORE.
PUSH AND/OR START-UP ALLOCATED BASED ON TARGET START APPROVAL 
TIME (TSAT) +/-5 MIN.

icao text:

A0084/26 NOTAMN
Q) LSAS/QFAXX/I/NBO/A/000/999/4614N00607E005
A) LSGG B) 2602050900 C) 2605060900
E) AP COLLABORATIVE DECISION MAKING (ACDM) PERM CONNECTED WITH
NETWORK MANAGEMENT OPS CENTRE. 
DEP PLANNING INFO MSG WITH FLT DATA SENT TO OPR NETWORK 
MANAGEMENT SYSTEM. FLT CREW REQUIRED TO CTC ATC FOR DEP CLR WI 
VALID TARGET OFF-BLOCK TIME (TOBT) -15/+5 MIN.
WHEN FLT IS READY OUTSIDE TOBT WINDOW, FLT CREW SHALL CTC GND
HANDLER BEFORE.
PUSH AND/OR START-UP ALLOCATED BASED ON TARGET START APPROVAL 
TIME (TSAT) +/-5 MIN.

downloads:


!! NOT FOR OPERATIONAL USE !! data may be stale, incomplete, or wrong

© 2026 coredoes.dev