← back

!! NOT FOR OPERATIONAL USE !! data may be stale, incomplete, or wrong


numberJ1676/26 CANCELLED
locationLTAI
begin2026-04-28 13:30 UTC (119d ago)
end2026-04-28 16:30 UTC (118d ago)
CADS id1661853
CADS seq-
CADS msgNMS_ID_1776432253804248

raw text:

ADVANCED ATC TOWER LIVE TRIAL(T4) IN PROGRESS.
DURING THIS PERIOD OPERATIONAL TRIAL WILL BE CONDUCTED TO VALIDATE 
AUTOMATED DATA EXCHANGE WITH THE NETWORK MANAGER(NM).
A-DPI, C-DPI AND TWR UPDATE MESSAGES WILL BE TRANSMITTED TO NM AND 
USED FOR AIR TRAFFIC FLOW AND CAPACITY MANAGEMENT(ATFCM) PURPOSES.
THE TRIAL AIMS TO IMPROVE TARGET TAKE-OFF TIME (TTOT) ACCURACY AND 
MINIMIZE FLIGHT SUSPENSIONS.

icao text:

J1676/26 NOTAMN
Q) LTAA/QSTXX/IV/NBO/A /000/999/3654N03048E005
A) LTAI B) 2604281330 C) 2604281630
E) ADVANCED ATC TOWER LIVE TRIAL(T4) IN PROGRESS.
DURING THIS PERIOD OPERATIONAL TRIAL WILL BE CONDUCTED TO VALIDATE 
AUTOMATED DATA EXCHANGE WITH THE NETWORK MANAGER(NM).
A-DPI, C-DPI AND TWR UPDATE MESSAGES WILL BE TRANSMITTED TO NM AND 
USED FOR AIR TRAFFIC FLOW AND CAPACITY MANAGEMENT(ATFCM) PURPOSES.
THE TRIAL AIMS TO IMPROVE TARGET TAKE-OFF TIME (TTOT) ACCURACY AND 
MINIMIZE FLIGHT SUSPENSIONS.

downloads:


!! NOT FOR OPERATIONAL USE !! data may be stale, incomplete, or wrong

© 2026 coredoes.dev