{"geometry":{"coordinates":[-45.28333333333333,6.683333333333334],"type":"Point"},"id":1609751,"properties":{"icao_location":"SOCA","icao_text":"\nG0141/26 NOTAMN\nQ) SOOO/QPFCA/IV/NBO/AE/000/245/0641N04517W625\nA) SOCA B) 2604162336 C) 2604171500\nE) FLOW CONTROL PROCEDURES DUE TO FLIGHT PLAN PLAN PROCESSING SYSTEM \nFAILURE :\n- RWY TRAININGS AND IFR PROC TRAININGS SUSPENDED\n- FLOW MANAGEMENT LIMITED TO 6 MOVES PER HOUR FOR TOWER APPROACH \nPOSITION\n- POSSIBLE HOLDING ON DEPARTURE FROM AD SOOA SOGS SOOM SOOS SOOC\n- NO FLOW REGULATION FOR ENR CONTROL CENTER POSITION.\n","id":1609751,"notam_number":"G0141/26","radius_nm":625.0,"raw_text":"FLOW CONTROL PROCEDURES DUE TO FLIGHT PLAN PLAN PROCESSING SYSTEM \nFAILURE :\n- RWY TRAININGS AND IFR PROC TRAININGS SUSPENDED\n- FLOW MANAGEMENT LIMITED TO 6 MOVES PER HOUR FOR TOWER APPROACH \nPOSITION\n- POSSIBLE HOLDING ON DEPARTURE FROM AD SOOA SOGS SOOM SOOS SOOC\n- NO FLOW REGULATION FOR ENR CONTROL CENTER POSITION.","status":"CANCELLED"},"type":"Feature"}