{"geometry":{"coordinates":[-76.4,38.28333333333333],"type":"Point"},"id":1490809,"properties":{"icao_location":"KNHK","icao_text":"M0379/26 NOTAMN \r\nQ) ZDC/QMRLC/IV/NBO/A/000/999/3817N07624W005 \r\nA) KNHK \r\nB) 2604141400 \r\nC) 2604142000 \r\nE) M K-7 OPERATIONS: ÂRWY 32 MK-7 SHIP SUITABILIITY FLIGHT TESTING SCHEDULED. RWY 32 IS SHORTENED. 8,100 FT REMAINING, THE FIRST 1,630 FT CLOSED EXCEPT FOR MK-7 OPERATIONS. PRACTICE APPROACHES WILL BE ON A WORKLOAD PERMITTING BASIS\"","id":1490809,"notam_number":"M0379/26","radius_nm":5.0,"raw_text":"M K-7 OPERATIONS: RWY 32 MK-7 SHIP SUITABILIITY FLIGHT TESTING SCHEDULED. RWY 32 IS SHORTENED. 8,100 FT REMAINING, THE FIRST 1,630 FT CLOSED EXCEPT FOR MK-7 OPERATIONS. PRACTICE APPROACHES WILL BE ON A WORKLOAD PERMITTING BASIS\"","status":"CANCELLED"},"type":"Feature"}